Pre-Engineered Smart Building & Automation Systems
SBA-0501 Published reference design

SBA-0501 — 1-Zone Wattstopper Dual-Tech Occupancy Reference Design

Legrand-WattStopper dual-technology occupancy control reference package for office / classroom, scaled to approximately 1 controlled or monitored zones.

Standard Legrand-WattStopper 1 zones / sensors Dual-technology occupancy control
SYSTEM ARCHITECTURE

How SBA-0501 is organized

Office / classroom · Legrand-WattStopper

Occupancy / temperature / energy inputField / source side
Thermostat / lighting controller / automation interfaceControl / switching / logic
HVAC / lighting / relay outputs / monitoringProtected / controlled endpoints
Local line / low-voltage control powerPower / backup / distribution
DESIGN INTENT

What this reference design is meant to do

Legrand-WattStopper dual-technology occupancy control reference package for office / classroom, scaled to approximately 1 controlled or monitored zones.

The bill of materials below is tied to actual Safsale catalog products. Use this page as a purchasing and planning baseline, then adjust quantities, interfaces, cable lengths, environmental requirements, power and commissioning to the real site.

Building-automation reference designs must be coordinated with the actual HVAC, lighting, electrical and control sequence. Verify voltage, load type, sensor coverage, BACnet/Modbus compatibility and equipment-specific commissioning.
Reference scale1 zones / sensors
TechnologyDual-technology occupancy control
Primary brandLegrand-WattStopper
Market tierStandard
Best fitOffice / classroom
Design classPre-engineered commercial reference design
ENGINEERING TOOLS

Calculate the dominant project constraints

REFERENCE BILL OF MATERIALS

SBA-0501 equipment list

Each row opens the live Safsale product card.

Required equipment total$258.54
Optional equipment shownRequest Quote
Request Project Quote
FAQ

SBA-0501 questions

What is included in SBA-0501?

The page lists the live Safsale catalog components used as the reference bill of materials for this design, including the primary hardware and supporting power, network, cabling or field components shown.

Can the products be substituted?

Yes when the substitute is technically compatible. Verify voltage, current, protocol, port count, environmental rating, interfaces, licenses and manufacturer-specific requirements before substitution.

Is SBA-0501 a final engineered drawing?

No. It is a pre-engineered reference and purchasing baseline. Final layout, cable routes, power, mounting, code, environmental and commissioning requirements depend on the actual project.

Which calculator should I use first?

Use the engineering-tool links on this page for the dominant sizing question: capacity, power, distance, port count, runtime, coverage or zone count.

Can Safsale quote a larger or smaller version?

Yes. Use this reference design as the starting point and request a project-specific quote for alternate quantities, brands, capacities, cable lengths, accessories or environmental requirements.

RELATED DESIGNS

Compare nearby reference systems

All SBA designs
NEED A SITE-SPECIFIC VERSION?

Use SBA-0501 as the baseline, then size it to the real project.

Safsale can quote alternate brands, capacities, cable lengths, accessories, environmental ratings and system quantities.