Pre-Engineered Perimeter & Gate Security Systems
PER-0801 Published reference design

PER-0801 — 1-Lane Keri OSDP Long-Range Gate Reference System

Keri Systems osdp long-range credential gate reference architecture for secure vehicle entrance, scaled to 1 controlled lane(s) or detection zone(s).

Pro Keri Systems 1 lanes / zones OSDP long-range credential gate
SYSTEM ARCHITECTURE

How PER-0801 is organized

Secure vehicle entrance · Keri Systems

Credential / vehicle approachField / source side
Gate controller / access logicControl / switching / logic
Operator + safety sensors + lockProtected / controlled endpoints
Gate power + backup / disconnect as requiredPower / backup / distribution
DESIGN INTENT

What this reference design is meant to do

Keri Systems osdp long-range credential gate reference architecture for secure vehicle entrance, scaled to 1 controlled lane(s) or detection zone(s).

The bill of materials below is tied to actual Safsale catalog products. Use this page as a purchasing and planning baseline, then adjust quantities, interfaces, cable lengths, environmental requirements, power and commissioning to the real site.

Powered vehicle gates require project-specific review of entrapment protection, monitored safety devices, operator instructions, emergency access, egress and applicable standards/manufacturer requirements.
Reference scale1 lanes / zones
TechnologyOSDP long-range credential gate
Primary brandKeri Systems
Market tierPro
Best fitSecure vehicle entrance
Design classPre-engineered commercial reference design
ENGINEERING TOOLS

Calculate the dominant project constraints

REFERENCE BILL OF MATERIALS

PER-0801 equipment list

Each row opens the live Safsale product card.

Required equipment total$1,801.74
Optional equipment shown$136.00
Request Project Quote
FAQ

PER-0801 questions

What is included in PER-0801?

The page lists the live Safsale catalog components used as the reference bill of materials for this design, including the primary hardware and supporting power, network, cabling or field components shown.

Can the products be substituted?

Yes when the substitute is technically compatible. Verify voltage, current, protocol, port count, environmental rating, interfaces, licenses and manufacturer-specific requirements before substitution.

Is PER-0801 a final engineered drawing?

No. It is a pre-engineered reference and purchasing baseline. Final layout, cable routes, power, mounting, code, environmental and commissioning requirements depend on the actual project.

Which calculator should I use first?

Use the engineering-tool links on this page for the dominant sizing question: capacity, power, distance, port count, runtime, coverage or zone count.

Can Safsale quote a larger or smaller version?

Yes. Use this reference design as the starting point and request a project-specific quote for alternate quantities, brands, capacities, cable lengths, accessories or environmental requirements.

RELATED DESIGNS

Compare nearby reference systems

All PER designs
NEED A SITE-SPECIFIC VERSION?

Use PER-0801 as the baseline, then size it to the real project.

Safsale can quote alternate brands, capacities, cable lengths, accessories, environmental ratings and system quantities.

Request Project Quote